Skip to Main Content
Loading
Loading
Create a Website Account
- Manage notification subscriptions, save form progress and more.
Website Sign In
Our Community
Departments
Government
Business Resources
Resident Help Center
Home
Our Community
Community Projects
Underwood Creek Daylighting
Reports & Studies
Reports & Studies
90% Complete Regulatory Construction Drawings
90% Regulatory Construction Drawings
75% Complete Construction Drawings
75% Complete Construction Drawings
Stantec Memo 06.08.18
Revised Preliminary Design - February 15, 2018
Public Information Meeting Presentation February 15, 2018 (PDF)
Exhibit 1 - Existing Conditions (PDF)
Exhibit 2 - New Channel Alignment (PDF)
Exhibit 3 - Parkway Road: Potential Option 1 (PDF)
Exhibit 4 - Parkway Road: Potential Option 2 (PDF)
Creek Cross Section - A (PDF)
Creek Cross Section - B (PDF)
Preliminary Design
Exhibit 1 - Preliminary Design Overview (PDF)
Exhibit 2 - Preliminary Channel and Pathway Overview (PDF)
Preliminary Underwood Creek and Trail Cross Section (PDF)
Preliminary Channel Limits (PDF)
Draft Preliminary Channel Plans (PDF)
Background & Purpose
Underwood Creek Naturalization Memorandum of Understanding, WDNR (PDF)
von Briesen & Roper, s.c. Legal Memorandum (PDF)
Ruekert & Mielke Cost-Effective Design Phase Concepts (PDF)
Stantec Summary of Underwood Creek Downtown Daylighting Project (PDF)
Stantec Presentation, November 30th 2016 (PDF)
Historical Photos
1940 - Underwood Creek Meandering Through Downtown Elm Grove (PDF)
1958 - The "daylight" Underwood Creek in Park and Shop Parking Lot (PDF)
Existing Conditions Inside the Box Culvert (PDF)
Correspondence
Meetings & Notifications
Reports & Studies
Arrow Left
Arrow Right
[]
Slideshow Left Arrow
Slideshow Right Arrow